Skip to content
Narqix Academy

Role Guide: Work Order Processor

30 min

For Work Order Processors on vendor-side (Side A) campaigns. After this page you will know what you own, how to run your shift hour by hour, which numbers you are measured on, who you hand work to, and when to escalate.

Track: Property Preservation · Role: Work Order Processor · Time to complete: 30 min

What you own

You are the heartbeat of the vendor's back office. Every order passes through your hands at least twice: when it arrives and when it goes back to the client. You own:

  • Order intake: pulling new orders from every client portal into the vendor's work order platform and tracker
  • Order review: the intake check on every order before it is accepted
  • Acceptance and commit dates: accepting inside the client's window with realistic dates
  • Crew packets: sending field crews everything they need
  • Field support: answering crew questions during field hours
  • Updates: completing and submitting updates in the client's portal
  • Rejections: working the rejection queue until it is empty
  • Status accuracy: every order in the tracker shows its true status at all times

You do not own photo QC sign-off (the Photo QC Specialist does), bid writing (the Bid Writer does), or invoicing (the Invoice and AR Assistant does). You do make sure each of them receives clean, complete work on time.

Your handoffs

You receive fromWhatYou pass toWhat
Client portalsNew orders, rejections, client messagesField crews or vendor DispatcherCrew packet, access info, photo checklist
Field crewsPhotos, notes, measurements, problemsPhoto QC SpecialistPhoto folder ready for QC
Photo QC SpecialistQC passed or fix listBid WriterCrew notes and damage photos for bids
Bid WriterFinished bids to attachInvoice and AR AssistantApproved orders ready to invoice
Team LeadPriorities, client rules, extensionsTeam LeadEscalations, end-of-shift report

Tools you use (generic)

  • Each client's portal (one login per person, never shared)
  • The vendor's work order platform
  • The campaign tracker (shared sheet or platform view)
  • Shared drive with one folder per order
  • Team channel for crews and the desk
  • Email and, when the campaign allows, phone

Daily rhythm

Your campaign sets your actual shift. This is the shape of a typical Narqix processor shift.

Time in shiftFocusDone when
First 15 minCheck in by your campaign's method. Read handover notes and the client rules sheet.You know every open issue from the last shift
15 to 60 minSweep every client portal for new orders and rejections. Intake check and accept.Zero unaccepted orders older than the check cycle
Hour 1 to 2Send crew packets for today and tomorrow. Confirm crews received them.Every dispatched order has a confirmed crew
Hours 2 to 6Updates from photos that passed QC. Field support on the team channel. Rejection queue check 1.Due-today orders submitted first
Every 2 hoursPortal sweep for new orders and rejectionsLogged in tracker
Mid shiftRejection queue check 2. Due tomorrow review.Every at-risk order has a plan
Hours 6 to 8Remaining updates. Rejection queue check 3. Extension requests for anything at risk.No order goes late without a documented extension request
Last 20 minTracker cleanup. Handover note. End-of-shift report to Team Lead.Next shift can start without asking you anything

Coach's note: work the queue by due date, not by order of arrival. A simple re-cut due today beats a big initial secure due in three days. Sort your tracker by due date every time you open it.

KPIs

These are Narqix starting targets. Your campaign may adjust them after the first month with the client.

KPINarqix starting targetHow it is measured
New orders accepted inside client window100 percentAccept time minus receive time
Simple updates per shift (re-cut, inspection)40 to 80Tracker count
Complex updates per shift (initial secure, trash-out with bids)10 to 25Tracker count
Photos received to update submittedSame US business day; within 4 hours for due-today ordersTracker timestamps
On-time update rate98 percent or moreSubmitted before due date
First-pass approval rate95 percent or more (aim for 98)Approved without rejection
Rejections fixed and resubmittedSame shiftRejection log
Tracker accuracy (spot check)100 percentTeam Lead audit

Writing a clean update

  1. Open the order instructions next to the portal update screen.
  2. Answer every required question. Use the photos to answer, not memory or the crew's text alone.
  3. Mark each task completed, or not completed with a reason.
  4. Place photos into each required slot in the right order: address set first, then each task before, during, after.
  5. Write comments in short factual sentences.
  6. Read the whole update once more from top to bottom.
  7. Submit. Screenshot the confirmation. Save it to the order folder.
  8. Update the tracker status and time.

Good comment examples:

"Re-cut completed front, sides and rear. Edged walkway and driveway. Clippings removed. Lot approx 7,200 sq ft. No new debris. No violations posted."

"Lock change completed on rear door to client key code. Lockbox installed on rear door handle, code entered per order. Old lockset left in kitchen drawer."

"Initial secure partially completed. Front door glass broken, clear-board bid attached. Basement has standing water approx 2 in, sump pump not working (power off). Bid for pump test after utilities on attached."

Quality checklist (before every submit)

  • Order number and address match the photos
  • Every ordered task is marked completed or not completed with a reason
  • Every required question answered and consistent with photos
  • Photo QC marked passed by the QC Specialist
  • Photos in the correct slots
  • Bids attached where damage or overage exists
  • Comments factual, no guesses, no opinions
  • Completion date inside the due date, or extension documented
  • Screenshot saved after submit
  • Tracker updated

Common mistakes

MistakeFix
Accepting orders outside coverageCheck county and ZIP against the coverage list at intake
Copying the crew's text straight into commentsRewrite into clear, factual sentences that match the photos
Submitting before QC passedQC sign-off is required on every order, every time
Forgetting the "not completed" reasonEvery task must have a status
Asking for an extension after the due dateAsk before, with a reason and a new date
Working rejections once a dayThree planned checks per shift
Using another person's portal loginUse only your own credentials

Escalation rules

SituationEscalate toWhen
Order at risk of missing due dateTeam Lead, then client coordinator for extensionAs soon as you know, never after the due date
House possibly occupied or hostile occupantTeam Lead and clientSame hour
Safety hazard reported by crewTeam Lead and clientImmediately
Crew asks you to reuse or change photosTeam LeadSame day, in writing
Client instruction conflicts with the guidelineTeam LeadBefore acting
Portal down or login lockedTeam Lead and campaign support contactWithin 15 minutes
Same rejection reason three times in a weekTeam Lead and QC SpecialistEnd of shift report

Never do this: never mark a task complete to "save" a due date, never submit photos that did not pass QC, and never share your portal login with anyone, including your teammates.

Check yourself

1. You have three orders: an initial secure due in 3 days, a re-cut due today, and an inspection due tomorrow. Which do you update first?

The re-cut due today, then the inspection due tomorrow, then the initial secure. Work by due date.

2. The crew texted "all done" but the photos show the rear yard not cut. What do you write in the update?

Mark the rear yard not completed with the reason (from crew or photos), or hold the update and ask the crew to return before the due date. Never mark it complete.

3. When should you request an extension?

As soon as you know the due date is at risk, always before the due date, with a clear reason and a realistic new date.

4. What do you save after every submit?

A screenshot of the submission confirmation, in the order folder.

© Narqix Academy

Sign up or log in to track your progress.